Outdoor Living Project in Kingston, Idaho — Real Pricing Data

This is a real outdoor living project with actual pricing data from a professional installer. Estimated June 1, 2026. Total project cost: $15,840.

Estimate breakdown for a motorized screen project totaling $15,840 in Kingston, Idaho: 264 units, prepared in June 2026.

Worth knowing for Idaho: this is a high desert / mountain climate, which means dry summers, intense high-altitude UV, and significant winter snow load. A well-spec'd outdoor shade for this region should account for the local wind exposure (moderate, higher in canyons) and UV load (high at altitude) — both of which influence the long-term cost-per-year of any installation. Estimating in the summer of 2026 is typical for Idaho — most outdoor shade installations book during peak season, when lead times stretch 6–10 weeks.

Project Summary

Product TypeOutdoor Living
LocationKingston, Idaho
DateJune 1, 2026
Total Price$15,840
Tax Rate0%
Number of Items6

Line Items & Pricing

DescriptionProduct TypeQtyUnit PriceTotal
Motorized Screen 160 $60 $9,600
Motorized Screen 100 $60 $6,000
Custom 2x4 aluminum post install 1 $2,000 $2,000
Installation 1 $0 $0
Shipping 1 $0 $0
June Promo 1 $0 $0

Product Specifications

Related Resources

Similar Projects

Frequently Asked Questions

How much does a outdoor living cost?
This outdoor living project totaled $15,840 with 6 line items installed by a professional contractor.
What is included in this outdoor living project?
This project includes 6 items: Motorized Screen at $9,600, Motorized Screen at $6,000, Custom 2x4 aluminum post install at $2,000, Installation at $0, Shipping at $0, June Promo at $0. Each item has detailed specifications including dimensions, colors, and product options.
Is this real pricing data?
Yes. All pricing on Riser Shade comes from real contractor estimates and professional installations. We analyze thousands of real projects to provide accurate market comparisons. This project's data is sourced from a verified professional installer estimate dated June 1, 2026. Client and contractor details are anonymized to protect privacy.