Outdoor Living Project in Leawood, KS — Real Pricing Data

This is a real outdoor living project with actual pricing data from a professional installer. Estimated April 3, 2026. Total project cost: $19,474.

This $19,474 motorized screen project was estimated in April 2026 for a homeowner in Leawood, KS, covering 303 units.

Kansas's climate — high winds, severe-storm activity, and large summer-to-winter temperature swings — drives different outdoor shade priorities than the national average. The local UV (high) pushes fabric selection toward solution-dyed acrylic or PVDF-coated mesh, and the wind exposure (very high) pushes hardware specs toward heavier-gauge cassettes and motorized retraction. Estimating in the spring of 2026 is typical for Kansas — most outdoor shade installations book during peak season, when lead times stretch 6–10 weeks.

Project Summary

Product TypeOutdoor Living
LocationLeawood, KS
DateApril 3, 2026
Total Price$19,474
Tax Rate9.10%
Number of Items6

Line Items & Pricing

DescriptionProduct TypeQtyUnit PriceTotal
Motorized Screen 100 $70 $7,000
Motorized Screen 100 $70 $7,000
Motorized Screen 100 $70 $7,000
Installation 1 $0 $0
April Promotion 1 $0 $0
CPP Promo 1 $0 $0

Product Specifications

Related Resources

Similar Projects

Frequently Asked Questions

How much does a outdoor living cost?
This outdoor living project totaled $19,474 with 6 line items installed by a professional contractor.
What is included in this outdoor living project?
This project includes 6 items: Motorized Screen at $7,000, Motorized Screen at $7,000, Motorized Screen at $7,000, Installation at $0, April Promotion at $0, CPP Promo at $0. Each item has detailed specifications including dimensions, colors, and product options.
Is this real pricing data?
Yes. All pricing on Riser Shade comes from real contractor estimates and professional installations. We analyze thousands of real projects to provide accurate market comparisons. This project's data is sourced from a verified professional installer estimate dated April 3, 2026. Client and contractor details are anonymized to protect privacy.