Outdoor Living Project in Atherton, CA — Real Pricing Data

This is a real outdoor living project with actual pricing data from a professional installer. Estimated May 26, 2026. Total project cost: $38,048.

Estimate breakdown for a motorized screen project totaling $38,048 in Atherton, CA: 602 units, prepared in May 2026.

For context, California homeowners installing an outdoor shade are working with mild coastal temperatures inland heat, and salt-air corrosion near the coast. That shapes what specs actually matter: wind rating (moderate, with sundowner and Santa Ana events in southern regions), UV-stable fabrics (high UV at altitude and in inland valleys), and corrosion-resistant hardware where salt-air or humidity is present. Estimating in the spring of 2026 is typical for California — most outdoor shade installations book during peak season, when lead times stretch 6–10 weeks.

Project Summary

Product TypeOutdoor Living
LocationAtherton, CA
DateMay 26, 2026
Total Price$38,048
Tax Rate8.40%
Number of Items8

Line Items & Pricing

DescriptionProduct TypeQtyUnit PriceTotal
Motorized Screen 100 $65 $6,500
Motorized Screen 100 $65 $6,500
Motorized Screen 100 $65 $6,500
Motorized Screen 100 $65 $6,500
Motorized Screen 100 $65 $6,500
Motorized Screen 100 $65 $6,500
Installation 1 $0 $0
Spring Promotion 1 $0 $0

Product Specifications

Related Resources

Similar Projects

Frequently Asked Questions

How much does a outdoor living cost?
This outdoor living project totaled $38,048 with 8 line items installed by a professional contractor.
What is included in this outdoor living project?
This project includes 8 items: Motorized Screen at $6,500, Motorized Screen at $6,500, Motorized Screen at $6,500, Motorized Screen at $6,500, Motorized Screen at $6,500, Motorized Screen at $6,500, Installation at $0, Spring Promotion at $0. Each item has detailed specifications including dimensions, colors, and product options.
Is this real pricing data?
Yes. All pricing on Riser Shade comes from real contractor estimates and professional installations. We analyze thousands of real projects to provide accurate market comparisons. This project's data is sourced from a verified professional installer estimate dated May 26, 2026. Client and contractor details are anonymized to protect privacy.