Outdoor Living Project in Spokane, Washington — Real Pricing Data

This is a real outdoor living project with actual pricing data from a professional installer. Estimated April 1, 2025. Total project cost: $17,456.

Real April 2025 motorized screen estimate from a verified contractor serving Spokane, Washington. Total cost came to $17,456 across 301 units.

Washington's climate — long shoulder seasons, persistent rain west of the Cascades, and arid summers east of them — drives different outdoor shade priorities than the national average. The local UV (moderate, with high summer indices) pushes fabric selection toward solution-dyed acrylic or PVDF-coated mesh, and the wind exposure (moderate, with strong fall and winter storms on the coast) pushes hardware specs toward heavier-gauge cassettes and motorized retraction. Estimating in the spring of 2025 is typical for Washington — most outdoor shade installations book during peak season, when lead times stretch 6–10 weeks.

Project Summary

Product TypeOutdoor Living
LocationSpokane, Washington
DateApril 1, 2025
Total Price$17,456
Tax Rate9.10%
Number of Items3

Line Items & Pricing

DescriptionProduct TypeQtyUnit PriceTotal
Motorized Screen 180 $60 $10,800
Motorized Screen 120 $60 $7,200
Installation 1 $2,500 $2,500

Product Specifications

Related Resources

Similar Projects

Frequently Asked Questions

How much does a outdoor living cost?
This outdoor living project totaled $17,456 with 3 line items installed by a professional contractor.
What is included in this outdoor living project?
This project includes 3 items: Motorized Screen at $10,800, Motorized Screen at $7,200, Installation at $2,500. Each item has detailed specifications including dimensions, colors, and product options.
Is this real pricing data?
Yes. All pricing on Riser Shade comes from real contractor estimates and professional installations. We analyze thousands of real projects to provide accurate market comparisons. This project's data is sourced from a verified professional installer estimate dated April 1, 2025. Client and contractor details are anonymized to protect privacy.