This is a real cable-guided screen system project with actual pricing data from a professional installer. Estimated October 6, 2025. Total project cost: $5,780.
Real October 2025 cable-guided screen system estimate from a verified contractor serving Monument, Colorado. Total cost came to $5,780 across 2 units.
Specifications include Ivory frame, Solar fabric, Suntex 97 mesh, Motor control.
Worth knowing for Colorado: this is a high-altitude continental climate, which means intense UV, large diurnal temperature swings, and chinook wind events. A well-spec'd screen system for this region should anticipate high, particularly along the Front Range and very high at altitude — both of which influence the long-term cost-per-year of any installation.The Solar selection on this estimate is a reasonable match for high-altitude continental conditions — solution-dyed acrylics resist the very high at altitude typical of Colorado better than vinyl, and shed humidity well. Motor controls are a sensible spec given high, particularly along the Front Range in this region — retraction during severe weather is the single biggest predictor of long-term screen system life. Estimating in the fall of 2025 is typical for Colorado — most screen system installations book in the shoulder months, when installer availability is better and material lead times shorten to 3–6 weeks.
| Product Type | Cable-Guided Screen System |
| Location | Monument, Colorado |
| Date | October 6, 2025 |
| Total Price | $5,780 |
| Tax Rate | 8.63% |
| Number of Items | 2 |
| Description | Product Type | Qty | Unit Price | Total |
|---|---|---|---|---|
| Open Roller (Cable Guided Screen System) | Cable-Guided Screen System | 1 | $2,799 | $2,799 |
| ||||
| Open Roller (Cable Guided Screen System) | Cable-Guided Screen System | 1 | $4,432 | $4,432 |
| ||||