Outdoor Living Project in West Richland, Washington — Real Pricing Data

This is a real outdoor living project with actual pricing data from a professional installer. Estimated February 19, 2026. Total project cost: $18,479.

Looking at what a motorized screen actually costs in West Richland, Washington? This professional estimate from February 2026 totaled $18,479 for 200 units.

Worth knowing for Washington: this is a marine / Pacific Northwest climate, which means long shoulder seasons, persistent rain west of the Cascades, and arid summers east of them. A well-spec'd outdoor shade for this region should account for the local wind exposure (moderate, with strong fall and winter storms on the coast) and UV load (moderate, with high summer indices) — both of which influence the long-term cost-per-year of any installation. Estimating in the winter of 2026 is typical for Washington — most outdoor shade installations book in the shoulder months, when installer availability is better and material lead times shorten to 3–6 weeks.

Project Summary

Product TypeOutdoor Living
LocationWest Richland, Washington
DateFebruary 19, 2026
Total Price$18,479
Tax Rate8.70%
Number of Items2

Line Items & Pricing

DescriptionProduct TypeQtyUnit PriceTotal
Motorized Screen 100 $85 $8,500
Motorized Screen 100 $85 $8,500

Product Specifications

Related Resources

Similar Projects

Frequently Asked Questions

How much does a outdoor living cost?
This outdoor living project totaled $18,479 with 2 line items installed by a professional contractor.
What is included in this outdoor living project?
This project includes 2 items: Motorized Screen at $8,500, Motorized Screen at $8,500. Each item has detailed specifications including dimensions, colors, and product options.
Is this real pricing data?
Yes. All pricing on Riser Shade comes from real contractor estimates and professional installations. We analyze thousands of real projects to provide accurate market comparisons. This project's data is sourced from a verified professional installer estimate dated February 19, 2026. Client and contractor details are anonymized to protect privacy.